#TBD : 34320720
0 Days Left
Canal/irrigation/dam Work
Gujarat
49.73 Lacs
Due on : 16 Apr, 2025
Sewage Treatment Plant Work, Cctv Camera Work And Any Other Miscellaneous Work For Various Office And Officers Quarter At Ukai
#TBD : 33784610
0 Days Left
Coal And Lignite
Gujarat
1.25 Lacs
Due on : 27 Jan, 2025
Repairing Of Boom Assembly Of Pandh-Ii Exc-1381 Electric Rope Shovel At Kakri Project.
#TBD : 34314278
0 Days Left
Road Work
Gujarat
Ref. Document
Due on : 08 Apr, 2025
Widening And Strengthening Of Panchpipla Char Rasta To Ghyasiyameda Joining Road Km 0/0 To 3/10
#TBD : 34170392
0 Days Left
Air Transport
Gujarat
1.38 Lacs
Due on : 24 Mar, 2025
Procurement Of Technical Furniture For Upcoming Ndb Site At Acs Songadh, 15 Office Table Computer Table Revolving Chair With Arm Rest Office Chairs With Arm Rest Wooden Side Table Steel Almirah Wheel Trolley For Test Equipment Hot And Cold Water Dispenser
#TBD : 34031823
0 Days Left
Air Transport
Gujarat
Ref. Document
Due on : 28 Feb, 2025
Supply of Executive Table (V3) (Q2) , Computer Table (V2) (Q2) ,
Revolving Chair (V4) (Q2) , Office Chair (V3) (Q2) , Side
Table (Q3) , Steel Shelving Cabinets (Adjustable Type)
confirming to IS 3312 (V3) (Q2) , Hot / Cold Water Dispenser
(V2) (Q3)
#TBD : 33969393
0 Days Left
Water Supply And Drainage
Gujarat
2.38 Lacs
Due on : 19 Feb, 2025
Tender For Water Tank Work At Koli Patel Cremation At Songadh Village
#TBD : 33911209
0 Days Left
Civil Work
Gujarat
9.52 Lacs
Due on : 12 Feb, 2025
S/R Road Civil Works. S/R To Rd Road To Lastala At Ch. 0/000 To 3/500 Km For The Year 2024-25
#TBD : 33971483
0 Days Left
Railway Transport
Gujarat
Ref. Document
Due on : 21 Feb, 2025
Supply of Kit, Wiper Motor Assembly For 1400 Hp Demu Dpc As Per Elgi Part No. Ieu6545010 Wi Per Motor Assy Lh- 1 No. Ii Eu654501a Wiper Motor Assy Rh-1 No. Iii Eu6545000 Control Valve Ass Y.- 2 Nos. Iv Eu6503002 Wiper Arm Assy-2 Nos. Veu6504000 Wiper Blade Assy-2 Nos. Vi Eu65450 40 Support Arm Pin Assy.-2 Nos. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs
#TBD : 34320709
0 Days Left
Canal/irrigation/dam Work
Gujarat
72.84 Lacs
Due on : 16 Apr, 2025
Cleaning And Painting To Downstream Face Of Radial Gates And Its Components At Ukai Dam
#TBD : 33848946
0 Days Left
Construction
Gujarat
24.26 Lacs
Due on : 31 Jan, 2025
Patch Wbm Grouting Re-Carpeting Road Side Pucca Drain And Allied Works Pr Of Road From Banerjee Para To Dakshin Laxmandhepa L-2.30 Km Portion From Ch-0.00 Km To Ch- 1.00 Km, L-1.00 Km Total Pr Length 1.00 Km Within Nalchar Rd Block Under The Jurisdiction Of