#TBD : 33550320
0 Days Left
Panchayat Division
Maharashtra
14.18 Lacs
Due on : 23 Dec, 2024
Proposed Construction Of Fstp At Solid Waste Management Site
#TBD : 33766103
0 Days Left
Panchayat Division
Maharashtra
Ref. Document
Due on : 22 Jan, 2025
Repair To Health Sub Center Building, Installation And Reparing Of Doors And Windows, Handpump Rapair And Installation Of Gate For Main Building, At Palasgad, Tah.
#TBD : 33274463
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 22 Nov, 2024
Supply of Description : Wheel Sensor With Protection Tube Of Frauscher Make Msdac Type Rsr 180 With Bbik-M-12-Gs02 Fixing Along With Cable Length Of 5 Meters. Make : Frauscher Warranty Period: 30 Months After The Date Of Delivery
#TBD : 33839949
0 Days Left
Panchayat Division
Maharashtra
9.28 Lacs
Due on : 31 Jan, 2025
Installation Of Solar Energy Based Dual Pump Mini Water Supply Scheme On Existing Borewell Near Tarachand Tembhurne House At Prabhag No 16 For Nagar Panchayat Kurkheda
#TBD : 32494011
0 Days Left
Civil Work
Maharashtra
2.79 Lacs
Due on : 14 Aug, 2024
Ajrana Kalan Minor Repair Work Of Gvh Block Thanesar Distt.Kurukshetra Ajrana Kalan 348842.86 Mino...
#TBD : 33999420
0 Days Left
Crude Oil And Natural Gas And Mineral Fuels
Maharashtra
Ref. Document
Due on : 03 Mar, 2025
Supply Of Natural Gas Service Regulator For City Gas Distribution
#TBD : 32513884
0 Days Left
Municipal Corporation
Maharashtra
12.42 Lacs
Due on : 16 Aug, 2024
Construction Of Street Construction Of Street From...
#TBD : 32785859
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 23 Oct, 2024
Supply of Double Cup For Ctrb Class E To Nei Drg.No Pesd-6085 Rev D Or Latest Warra Nty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
#TBD : 32784436
0 Days Left
Construction
Maharashtra
3.20 Crore
Due on : 30 Sep, 2024
Widening And Improvement Of Sangadi Navegan Keshori Idada Vadegaaon To State Border Road Sh 362 Km. 59/575 To 60/200 And Km. 78/00 To 79/300 And Construction Of C.D Works And Protection Wall In Km. 57/200