#TBD : 32902644
0 Days Left
Education And Research Institutes
Uttaranchal
Ref. Document
Due on : 05 Nov, 2024
Supply of Set Of Snap Action Switch/ Micro Switch 02 Items 05 Nos: 1 Micro Switch Typ E S845- I-20 To Schaltbau Pt No. 1.1545.194558 Or Secheron Pt No. Hbta420574 P0002 02 Nos . 2 Micro Switch Type S846-I-20 To Schaltbau Pt No. 1.1546.194116 Or Secheron Pt No. Hbta4 20574 P0001 03 Warranty Period: 30 Months After The Date Of Delivery
#TBD : 26772206
0 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 15 Feb, 2023
Construction Of Retaining Walls Near Transit Camp To Protect Transit Camp Terrace & Tower No.-12 Of Koteshwar- Meerut Transmission Line
#TBD : 33650807
0 Days Left
Power Plant
Uttaranchal
96.68 Lacs
Due on : 09 Jan, 2025
Custom Bid For Services - Daily Routine Maintenance Annual And Major Maintenance Of Station Auxiliaries Systems Installed At Koteshwar Power House Switchyard And Dam Area For A Period Of 01 Year
#TBD : 26772239
0 Days Left
Power Plant
Uttaranchal
22.4 Thousand
Due on : 27 Jan, 2023
Carrying Out Survey For Diversion Of Transmission Line Due To Ongoing Construction Of Distributary Canal
#TBD : 31464393
0 Days Left
Power Plant
Uttaranchal
47.93 Lacs
Due on : 15 Apr, 2024
Annual Maintenance For Civil Work Of Residential And Non-Residential Buildings At Hep, Koteshwar
#TBD : 32331877
0 Days Left
Power Plant
Uttaranchal
7.73 Lacs
Due on : 21 Aug, 2024
Painting Of Ip Bus Duct At El - 570.0M Installed At Koteshwar Power House Painting Of Ip Bus Duct At El- 570.0M Installed At Koteshwar Power House
#TBD : 33232991
0 Days Left
Power Plant
Uttaranchal
7.73 Lacs
Due on : 25 Nov, 2024
Painting Of Ip Bus Duct At El 570.0M Installed At Koteshwar Power House
#TBD : 31881259
0 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 20 Jun, 2024
Construction Work Of Water Engineer Office Building In Sitabpur Tube Well Complex Under Branch Kotdwar.