#TBD : 34435516
8 Days Left
Canal/irrigation/dam Work
West Bengal
9.19 Lacs
Due on : 12 May, 2025
Repairing, Maintenance And Painting Of 56 Nos Gates At Different Location Of Ksmc And Bkbc Under Bolpur Irrigation Sub-division During 2025-26
#TBD : 34436352
10 Days Left
Water Supply And Drainage
West Bengal
Ref. Document
Due on : 14 May, 2025
Supply And Delivery Of Gaseous Chlorination Spares At Ohr Sites Zone - Iii, Iv, V, Vi, Vii And Viii Of Pwss For Fluoride Affected Mouzas Under Suri-i, Suri-ii And Sainthia Block,
#TBD : 34436055
0 Days Left
Municipal Corporation
West Bengal
4.89 Lacs
Due on : 28 Apr, 2025
Construction Steel Structure Shed At Ground Floor Infront Of Sanitary Section Under Bolpur Municipality
#TBD : 34433429
1 Days Left
Panchayat Division
West Bengal
2.50 Lacs
Due on : 05 May, 2025
Construction Of Of Drain From Gram Dighi Pond Towards Chandi House
#TBD : 34436989
10 Days Left
Construction
West Bengal
20.76 Lacs
Due on : 14 May, 2025
Suri-amjora Road From 18.05 Km To 20.60 Km, Surfacing Work Under Birbhum Highway Division-ii,
#TBD : 34433572
0 Days Left
Panchayat Division
West Bengal
1.50 Lacs
Due on : 30 Apr, 2025
Installation Of Submersible Pump With Pipe Line At Gram Panchayet Area For Creation Of A New Source Of Drinking Water Under Srinidhipur Gp
#TBD : 34436348
2 Days Left
Water Supply And Drainage
West Bengal
Ref. Document
Due on : 06 May, 2025
Yeard Lighting Arrangement For Ohr Site Of Amlachaturi Water Supply Scheme Water Supply Scheme Under Bolpur Mechanical Division, Phe. Dte.
#TBD : 34437231
11 Days Left
Power
West Bengal
Ref. Document
Due on : 15 May, 2025
Construction Of Precast Concrete Slabs At Different Locations Of 400 Kv Switchyard And Other Areas Of Bktpp Phase-ii.
#TBD : 34435842
0 Days Left
Municipal Corporation
West Bengal
Ref. Document
Due on : 30 Apr, 2025
Maintenance Of Led Rope Light Arounded To Existing 6m Octagonal Pole Other Link Road
#TBD : 34437144
10 Days Left
Construction
West Bengal
7.61 Lacs
Due on : 14 May, 2025
Traffic Calming Measures For Road Safety By Construction Of Circular Hamp On Different Link Roads Of Ahmedpur-kirnahar-ramjibanpur Road Sh-6from 0.00 Kmp To 15.00 Kmp Under Kirnahar Highway Sub Division Of Birbhum Highway Division-ii, P.w.roads