#TBD : 34426659
0 Days Left
Coal And Lignite
Telangana
6.00 Crore
Due on : 30 Apr, 2025
Hiring Of 2nos Of 4.6cu.m Capacity Front End Loaders@6500t/day Crushed Coal Into Tippers On Tonnage Basis With A Total Quantity Of 50.00lt For A Period Of 2 Years At Ktk Oc-iii Project, Bhupalpalli Area
#TBD : 34426074
5 Days Left
Power Plant
Telangana
2.44 Lacs
Due on : 09 May, 2025
Fabrication And Erection Of Arch Shaped Structural Steel Parking Shed In An Open Space Between Esp Control Building And Ash Slurry Pumphouse At Kakatiya Thermal Power Project
#TBD : 34427362
5 Days Left
Power Plant
Telangana
3.72 Lacs
Due on : 09 May, 2025
Removal Of Deposited Silt, Sand, Sludge From Stage-i Ii Tanks Of Intermediate Booster Pump House, Kataram For The Year 2025-26
#TBD : 34426248
5 Days Left
Coal And Lignite
Telangana
23.58 Lacs
Due on : 09 May, 2025
Maintenance And Repair Works To Public Buildings And Residential Buildings Ma Mb Mc Type Quarters At Manjoornagar
#TBD : 34423237
4 Days Left
Power Plant
Telangana
4.91 Lacs
Due on : 08 May, 2025
Providing Rcc Precast Slabs Over Cable Trenches In 400 Kv Switchyard Of Stage Ii.
#TBD : 34421084
0 Days Left
Power Plant
Telangana
3.58 Lacs
Due on : 28 Apr, 2025
Fabrication And Reconditioning Of Inner Cones Duly Providing Platform For Xrp-1043 Bowl Mills Of Boiler Maintenance Division For Annual Maintenance For The Year 2025-26.
#TBD : 34423266
4 Days Left
Power Plant
Telangana
4.41 Lacs
Due on : 08 May, 2025
Cleaning Of Catch Drain From Silo Stage I Ii To Moranchavagu, Kaccha Drain From Brick Plant To East Side Toe Drain Of Ashpond Before Monsoon For The Year 2025-26
#TBD : 34413658
8 Days Left
Coal And Lignite
Telangana
4.03 Lacs
Due on : 12 May, 2025
Procurement Of Paints For Bhupalapalli Area Stores
#TBD : 34411331
8 Days Left
Coal And Lignite
Telangana
6.87 Lacs
Due on : 12 May, 2025
Procurement Of S.c.b.r.water Hose Pipe 75mm For Bhupalpally Area
#TBD : 34411376
9 Days Left
Power Plant
Telangana
4.89 Lacs
Due on : 13 May, 2025
Emd-rewinding And Providing Sleeves To The End Shield Of 3ph, 415v Lt Motors Of Various Capacities Of Electrical Maintenance Division/stage-i/ktpp 1x500mw As And When Required During The Year 2025-26