#TBD : 31923537
5 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
28.70 Lacs
Due on : 21 Jun, 2024
Construction Of Fis Planoo To Shaloon In Gp Devnagar
#TBD : 31897125
2 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
6.75 Lacs
Due on : 18 Jun, 2024
Source Level Augmentation Of Water Supply Schemes Under Jsv Section Jhandutta From Seer Khad In Tehsil Jhandutta Distt. Bilaspur Hp Sh Construction Of Over Head Storage Tank 30000 Ltrs Capacity With 10 Mtrs Staging Height
#TBD : 31909330
3 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
5.28 Lacs
Due on : 19 Jun, 2024
Laying, Jointing And Testing Of Gi Pipes In Distribution System At Village Palu
#TBD : 31909364
8 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
5.99 Crore
Due on : 24 Jun, 2024
Design, Construction, Testing, Commissioning And Operation Of Sewerage Treatment Plant 1.19 Mld Capacity Based On Mbbr Technology In Zone A And Bio-Digester 0.35 Mld Capacity In Zone-B, Including Tertiary Treatment With Automation Including Oper
#TBD : 31909525
3 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
54.63 Lacs
Due on : 19 Jun, 2024
Construction Of Inspection Hut On Existing Inspection Hut At Shallna Painting On Existing Building.
#TBD : 31909336
3 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
5.75 Lacs
Due on : 19 Jun, 2024
Laying, Jointing Testixdng Of Gi Pipes Of Various Dia In Distribution System In Various Villages
#TBD : 31909804
26 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
Ref. Document
Due on : 12 Jul, 2024
Tender For Drinking Water Improvement And Livelihood Project
#TBD : 31897113
2 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
9.02 Lacs
Due on : 18 Jun, 2024
Source Level Augmentation Of Water Supply Schemes Under Jsv Section Berthin From Sukkar Khad In Tehsil Jhandutta Distt Bilaspur Hp Sh Construction Of Over Head Storage Tank 45100 Ltrs Capacity With 10 Mtrs Staging Height At Lower Sangaswin
#TBD : 31924069
8 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
2.89 Crore
Due on : 24 Jun, 2024
Construction Of Head Weir Co Desilting Tank Co Rcc Sump Well Co Pump House Cum Attendant Room Co Wc Toilet Co Delivery Tank 2 Nos Co Hydrant Post 34 Nos And Supply And Erection Of Pumping Machinery 1St Phase And 2Nd Phase And Pjlt Of Mserw Pipe, Pjlt Of Hdpe Et
#TBD : 31897118
3 Days Left
Canal/irrigation/dam Work
Himachal Pradesh
4.32 Crore
Due on : 19 Jun, 2024
Construction Of Rain Water Harvesting Structure Of Height 13.00 Mtrs. On Mao Khas Khad In Village Mao Khas