#TBD : 35140031
2 Days Left
Water Supply And Drainage
Kerala
1.59 Lacs
Due on : 20 Aug, 2025
Implementation Of Pumping Scheme At Govt. Lps Kangazha, Kangazha Gp In Kottayam District.
#TBD : 35042729
0 Days Left
Water Supply And Drainage
Kerala
1.19 Lacs
Due on : 11 Aug, 2025
Construction Of 110 Mm Diameter Borewell Near Irumbanangad School In Ezhukone Grama Panchayath, Under The Lsgd Deposit Work
#TBD : 35140023
3 Days Left
Water Supply And Drainage
Kerala
5.55 Lacs
Due on : 21 Aug, 2025
Construction Of Tube Well Near Vengapotta Tank In Connection With Moolakkara Sreenarayana Dwss, Kottukal Gp, Kovalam Constituency, Thiruvananthapuram
#TBD : 34983213
0 Days Left
Water Supply And Drainage
Kerala
3.22 Lacs
Due on : 06 Aug, 2025
Construction Of Bore Wells At Kochuthannimoodu Anganwadi, Chonanvila Lakshamveeducolony, Nalandha Jn. In Nanniyodegp, Construction Of Bore Wells At Kochuthannimoodu Anganwadi, Chonanvila Lakshamveedu Colony, Nalandha Jn. In Nanniyode Gp, Thiruvananthapuram
#TBD : 35086113
0 Days Left
Water Supply And Drainage
Kerala
10.00 Lacs
Due on : 12 Aug, 2025
Implementation Of Aasharikkunnu Dwss In Ward 2, Chelakkara Gp
#TBD : 35078147
0 Days Left
Water Supply And Drainage
Uttar Pradesh
Ref. Document
Due on : 11 Aug, 2025
Installation Of 25 No Piezometers At Various Block Of Districts Meerut Baghpat And Hapur
#TBD : 35061870
0 Days Left
Water Supply And Drainage
Uttar Pradesh
Ref. Document
Due on : 11 Aug, 2025
Installation Of 25 No Piezometers At Various Block
#TBD : 35049417
0 Days Left
Water Supply And Drainage
Kerala
3.11 Lacs
Due on : 08 Aug, 2025
Construction Of Bore Wells At Manaluvila Lakshamveed Colony In Perunkadavila Gramapanchayath And Tcs, Technopark,
#TBD : 35042096
0 Days Left
Water Supply And Drainage
Rajasthan
50.00 Lacs
Due on : 18 Aug, 2025
Slot Cutting Work For- 1. Ms/ Gi Pipe Sizes 50 To 200mm Nb 2. Ms/ Gi Pipe Size 250mm Nb Arc For Slot Cutting Work On Ms Or Gi Pipe
#TBD : 35058321
0 Days Left
Water Supply And Drainage
Uttar Pradesh
Ref. Document
Due on : 13 Aug, 2025
Installation Construction Of New Piezometers