#TBD : 29751123
0 Days Left
Power Plant
Jammu And Kashmir
Ref. Document
Due on : 16 Oct, 2023
Supply Installation Erection And Commissioning Of 1No Dedicated 11Kv Outgoing Vcb Panel Along With Dp Outgoing Structure For Supply To Proposed Power Plant Green Hydrogen Stationntpc From 6.3Mva 6611Kv Chushot Substation
#TBD : 30434685
0 Days Left
Power Plant
Uttar Pradesh
4.00 Lacs
Due on : 11 Jan, 2024
Purchase Of G.I Pipe And Fittings
#TBD : 30502599
0 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 15 Jan, 2024
Request For Proposal For Selection Of Managed Service Providermsp For Design, Development,
Operations And Maintenance Of Cpc Tds 2.0 Rfp For Selection Of Managed Service Providermsp For Cpc Tds 2.0
#TBD : 30283658
0 Days Left
Power Plant
Ladakh
Ref. Document
Due on : 25 Dec, 2023
Supply, Installation, Testing, Commissioning Of 11Kv Ht 2 Plus3 Vcb Panel Along With Synchronization Panel With Micro Grid At 2X200 Kw Hunder Hep Sitc Of 11Kv Ht 2 Plus 3 Vcb Panel Along With Synchronization Panel With Micro Grid At 2X200 Kw Hunder Hep
#TBD : 31881932
2 Days Left
Power Plant
Orissa
Ref. Document
Due on : 17 Jun, 2024
Supply Of Electric Ceiling Fan With Bldc Motor As Per Is 374 V2 Q2
#TBD : 29620675
0 Days Left
Power Plant
Jammu And Kashmir
11.14 Lacs
Due on : 06 Oct, 2023
Providing Submersible Pump At Mhs Haftal
#TBD : 31040683
0 Days Left
Power Plant
Puducherry
Ref. Document
Due on : 22 Feb, 2024
Supply of 20 Led Luminaire For Road And Street Lights As Per Is 10322 Is 16107 Is 16108 Is 16103 Is 10322 Q3
#TBD : 29620676
0 Days Left
Power Plant
Jammu And Kashmir
15.00 Lacs
Due on : 06 Oct, 2023
Providing Crate Protection Work For Diverting The Flow Of Water Into The Innundation Channel At Mhs Haftal
#TBD : 29751042
0 Days Left
Power Plant
Jammu And Kashmir
25.01 Lacs
Due on : 16 Oct, 2023
Providing And Fixing Of Railing, Raising Boundary Wall Installation Of Gate To Je, Staff Quarter, Ib And Guard Room And Water Connection To Staff Quarter At Hanu Hep
#TBD : 30697541
0 Days Left
Power Plant
Nagaland
Ref. Document
Due on : 06 Feb, 2024
Design, Manufacture, Supply, Erection, Testing And Commissioning With 5 Years Cmc Of Off-Grid Solar Power Plant To Be Installed At 4 District Court Complexes