#TBD : 31767053
6 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 28 May, 2024
Strengthening Ad Retrofitting Of Intake Well Structure Work Near Zero Bridge Under New Tehri Pumping Water Supply Scheme
#TBD : 31727225
0 Days Left
Water Supply And Drainage
Uttaranchal
1.36 Crore
Due on : 13 May, 2024
Supply And Laying Of 350 Mm Dia Mserw Pipe Line Work Near Zero Bridge Under New Tehri Pumping Water Supply Scheme
#TBD : 31756104
15 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 06 Jun, 2024
Construction Of Co-Treatment For Septage Facilities Of Capacity 260 Kld, At Kargi Stp Including All Appurtenant Structures, Allied Works Like Rising Mains Etc. And Six Month Trial And Run Period Of The Complete Works
#TBD : 31767058
6 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 28 May, 2024
Strengthening And Retrofitting Of Intake Well Structure Work Near Zero Bridge Under Surjula Pumping Water Supply Scheme
#TBD : 31727254
0 Days Left
Water Supply And Drainage
Uttaranchal
35.33 Lacs
Due on : 13 May, 2024
Supply, Installation, Testing, Commissioning Of 400 Kva Transformer With All Necessaries At Zero Point Intake Well Station Under New Tehri Pumping Water Supply Scheme
#TBD : 31752259
8 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 30 May, 2024
Necessary Repair Of Vertical Reservoir Of 700 Kl Capacity In Engineers Enclave Phase-1 And Related Work
#TBD : 31750161
15 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 06 Jun, 2024
Co Treatment Related Work For Septage Treatment In 68 Mld Sewerage Treatment Plant
#TBD : 31727221
0 Days Left
Water Supply And Drainage
Uttaranchal
52.98 Lacs
Due on : 13 May, 2024
Strengthening And Retrofitting Of Intake Well Structure Work Near Zero Bridge Under New Tehri Pumping Water Supply Scheme
#TBD : 31734757
0 Days Left
Water Supply And Drainage
Uttaranchal
Ref. Document
Due on : 21 May, 2024
Supply Of Solenoid Valve And Reflex Valve For 350 Mm Diameter Rising Main Pipeline From Zero Point Intake Well To Pre Setting Pumping Station And Other Related Works
#TBD : 31749248
13 Days Left
Water Supply And Drainage
Uttaranchal
1.57 Lacs
Due on : 04 Jun, 2024
Construction Of Septage Co Treatment Unit At 33 – Mld Stp Saliyar Roorkee