#TBD : 31732534
6 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 24 May, 2024
Insulation, Panelling, Deck Covering And Furniture Work On Board Of 27.5 Meter Roro Vessel, Yd. 805 Of Wbtc Ltd. At Swl Premises As Detailed In Section B And C
#TBD : 31713790
3 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 21 May, 2024
Various Steel Outfit Work On Board Of 27.5 Meter Roro Vessel, Yd. 805 Detailed In Section B And C At Swl Premises As Per The Drawings Of Various Respective In Compliance To Niet Clauses. Various Steel Outfit Work On Board Of 27.5 Meter Roro Vessel, Yd. 805 Of Wbtc Ltd.
#TBD : 31713810
3 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 21 May, 2024
Supply Of Cast Steel Stockless Hhp Anchor Bower 218 Kg, 17.5 Mm Dia Grade Cc2 Stud Link Chain Cable Each Length 13.75, D Shackle Suitable For Anchor Holding, Swivel Complete Suitable For 17.5 Mm Dia Chain, D Shackle For Joining Swivel And Anchor Etc
#TBD : 31711112
3 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 21 May, 2024
Installation, Fitting/ Fixing/ Testing, Commissioning Of Electrical And Electronic Equipment/Systems As Well As Associated Work On Board Of 27.5 Meter Roro Vessel, Yd. 805 Detailed In Section B And C At Swl Premises As Per The Electrical Drawings
#TBD : 31711121
3 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 21 May, 2024
Fabrication And Installation Of Piping Systems Bilge, Fire, Air, Filling, Sounding, Engine Exhaust, Hydraulic And Others Work Along With Associated Works On Board Vessel Yard 805 Detailed In Section B And C At Swl Premises.
#TBD : 31671178
0 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 09 May, 2024
Complete Ventilation System Comprising Of Design, Drawing, Manufacturing, Supply, Trial Run And Commissioning On Board 27.5 Meter Roro Vessel, Yard 805 Of Wbtc Ltd. At Swl Premises As Detailed In Section B And Section C Complete Ventilation System Of 27.5 Meter Roro Vessel, Yd. 805 Of Wbtc Ltd.
#TBD : 31636835
0 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 29 Apr, 2024
Complete Erection, Installation And Alignment Work Of Stern Gear And Steering Gear System Both For Port And Stbd Side Including Respective Machinery Or Equipment On Board 27.5 M Roro Vessel, Yard 805 Of Wbtc At Swl Premises As Detailed In Section B
#TBD : 31537008
0 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 04 Apr, 2024
Manufacture And Supply Of Marine Light Fittings For Construction Of 27.5 M Roro Vessel, Yd. 805 For Wbtc Ltd. As Per Section B And C Of The Niet.
#TBD : 31522463
0 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 02 Apr, 2024
Supply Of MS Erw Black And Galvanised And Seamless Pipes For Roro Vessel, Yd. 805 For Wbtc Ltd. As Per Section B And C
#TBD : 31431895
0 Days Left
Shipping Transport
West Bengal
Ref. Document
Due on : 27 Mar, 2024
Manufacture And Supply Of Valves And Fittings For Construction Of 27.5 M Roro Vessel, Yd. 805 For Wbtc Ltd. As Per Section B And C Of The Niet. Manufacture And Supply Of Valves And Fittings For Construction Of 27.5 M Roro Vessel, Yd. 805 For Wbtc Ltd.