#TBD : 31757464
0 Days Left
Power Plant
Uttar Pradesh
7.00 Lacs
Due on : 22 May, 2024
Construction Of 15 Kva Electrical Load Connection Line At Principal Government College, Jaitpur And 25 Kva Electrical Load Connection Line At Hitech Nursery Belatal Under Power Distribution Division-Ii, Mahoba On Semi-Turnkey Basis. Full Deposit Electrification Work Under Edd-Ii
#TBD : 31753526
19 Days Left
Power Plant
Uttar Pradesh
72.15 Lacs
Due on : 10 Jun, 2024
Installation Of Additional 33/0.4 Kv 2 Mva Transformer With All Accessories In Kulpahad Sprinkalar Irrigation Project Distt Turn-Key
#TBD : 31757349
1 Days Left
Power Plant
Uttar Pradesh
10.00 Lacs
Due on : 23 May, 2024
Installation Of New 33 Kv Vcb Contol Panel Unde Edc In Business Plan 2024-25 Semiturnkey Basis
#TBD : 31753517
0 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 21 May, 2024
33 Kv Substations/Line Erection/Strengthening Works Under Business Plan 2024-25 In The Area Of Edc Ii, On Semi Turnkey Basis
#TBD : 31753436
1 Days Left
Power Plant
Uttar Pradesh
5.28 Lacs
Due on : 23 May, 2024
Providing 1 nos diesel Operated Jeep with driver
#TBD : 31753432
0 Days Left
Power Plant
Uttar Pradesh
2.00 Lacs
Due on : 22 May, 2024
Repairing Of Vcb In The Area Of Edsd Ist Jaithra Under Edd Ist
#TBD : 31753480
0 Days Left
Power Plant
Uttar Pradesh
9.68 Lacs
Due on : 22 May, 2024
Additional 5 Mva Tf In 33/11 Kv Bharwara S/S Increasing Capacity From 5 Mva T/F In 33/11 Kv Kabrai, Mahoba Semi Turn-Key
#TBD : 31753477
0 Days Left
Power Plant
Uttar Pradesh
1.60 Lacs
Due on : 20 May, 2024
Repair Of 5 mva Power Transformer
#TBD : 31753518
0 Days Left
Power Plant
Uttar Pradesh
20.00 Lacs
Due on : 22 May, 2024
Augmentation Of L.T. Lines Against Additional Business Plan 2024-25 For Quality Power Supply In Aligarh City On Semi Turn-Key Basis Under The Area Eudc
#TBD : 31753514
1 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 23 May, 2024
Construction of 33/11 KV S/s UPSIDA, Khimsepur And associated 33 kv line under Full Deposite Scheme on Turn-Key basis.