#TBD : 31769748
17 Days Left
Construction
Himachal Pradesh
Ref. Document
Due on : 08 Jun, 2024
Supply of 1000 6 X 36 - Ungalvanised Steel Wire Rope Of Size 20 Mm With Steel Core Iwrc Duly Isi Marked With A Re
#TBD : 31768940
5 Days Left
Construction
Punjab
Ref. Document
Due on : 27 May, 2024
Supply of 2 Ductable Air Conditioner Q3
#TBD : 31763908
13 Days Left
Construction
Himachal Pradesh
17.53 Lacs
Due on : 04 Jun, 2024
Removal/Clearance Of Weed Growth Congress Grass, Shrubs And Jungle Bushes Of View Point Complex Area Lawn, Inside And Outside Along Br Slopes Sundernagar Four Cutting In A Year Mtc Of Landscaped Slops Of Br And Collection Of Trash From Br Slops
#TBD : 31761862
12 Days Left
Construction
Himachal Pradesh
Ref. Document
Due on : 03 Jun, 2024
Restoration And Stabilization Of Damaged Outer Slopes Of Sundernagar Hydel Channel By Providing Pcc Block Pitching, Herring Bone Drain And Geo Synthetic Mat On Embankment Slopes
#TBD : 31764131
13 Days Left
Construction
Himachal Pradesh
15.86 Lacs
Due on : 04 Jun, 2024
Removal And Clearance Of Weeds Growth, Congress Grass, Shrubs And Jungle Bushed Of Inner Slopes, Embankment And Side Drains Of Suketi Diversion Channel And Hiring Requirement Of Poclain, Jcb And Tipper For Clearance Or Various Nalahas
#TBD : 31764023
17 Days Left
Construction
Chandigarh
Ref. Document
Due on : 08 Jun, 2024
Custom Bid For Services - Capital Maintenance Of Rotary Valves Of Dehar Unit No 1 And 2 Without Replacement Of Trunnion Bushes And Procurement Of Spares At Dehar Power House Slapper Through Oem
#TBD : 31763884
12 Days Left
Construction
Himachal Pradesh
4.72 Crore
Due on : 03 Jun, 2024
Restoration And Stabilisation Of Damaged Outer Slopes Of Sundernagar Hydel Channel By Providing Pcc Block Pitching, Herring Bone Drain And Geo Synthetic Mat On Embankment Slopes Of Sundernagar Hydel Channel At Bsl P Bbmb Sundernagar
#TBD : 31764304
17 Days Left
Construction
Punjab
Ref. Document
Due on : 08 Jun, 2024
Supply of 4 Plastic Body Evaporative Coolers - Desert Cooler Q3
#TBD : 31764797
3 Days Left
Construction
Haryana
Ref. Document
Due on : 25 May, 2024
Supply of Automotive Vehicles - Pneumatic Tyres For Passenger Car Vehicles - Diagonal And Radial Ply As Per Is 15633 Q2 Automotive Vehicles - Pneumatic Tyres For Commercial Vehicles - Diagonal And Radial Ply As Per Is 15636 Q2
#TBD : 31767588
14 Days Left
Construction
Delhi
26.9 Thousand
Due on : 05 Jun, 2024
Laundry Service - Commercialresidentialtransportindustrial Purpose