#TBD : 30423888
0 Days Left
Construction
Himachal Pradesh
23.10 Lacs
Due on : 02 Jan, 2024
C/O Nallah Along Road To Msw Plant At Kenduwal Gp Haripur Sandholi Tehsil Baddi Distt. Solan Hp.
#TBD : 30202572
0 Days Left
Construction
Himachal Pradesh
9.32 Lacs
Due on : 15 Dec, 2023
Annual Repair Maintenance Operation To Satellite Office Nalagarh.
#TBD : 30415924
0 Days Left
Construction
Himachal Pradesh
9.16 Lacs
Due on : 02 Jan, 2024
Beautification Of Panjehra Palli Gulabpura Road Chowk, G.P. Panjehra.
#TBD : 30424295
0 Days Left
Construction
Himachal Pradesh
6.64 Lacs
Due on : 02 Jan, 2024
Providing Hume Pipes Near H/O Narender Pal And Others, Village Manjhotu, G.P. Barotiwala. C/O Street And Drain From H/O Rajesh Tanwar And Others To Nearby Nallah, Ward No.-3, G.P. Barotiwala.
#TBD : 30416047
0 Days Left
Construction
Himachal Pradesh
23.10 Lacs
Due on : 02 Jan, 2024
Construction Of Road From Near Boundary Wall Of Gsss Haripur Sandholi To Gurudawara Haripur Sandholi G.P. Haripur Sandholi Tehsil Baddi Distt. Solan Hp.
#TBD : 30202870
0 Days Left
Construction
Himachal Pradesh
4.69 Lacs
Due on : 15 Dec, 2023
Providing And Fixing High Mast Light For Baba Nahar Singh Kushti Ground, G.P. Kirpalpur.
#TBD : 30424288
0 Days Left
Construction
Himachal Pradesh
6.64 Lacs
Due on : 02 Jan, 2024
C/O Road From Abhipur-Dhela Road To Sheetla Mata Mandir, G.P. Dhela.
#TBD : 30416005
0 Days Left
Construction
Himachal Pradesh
23.28 Lacs
Due on : 02 Jan, 2024
C/O Road And Culvert Jatt Vass Joghon, C/O Pucca Path/Link Road From Bridge To Dolan Village Gp Joghon
#TBD : 30415985
0 Days Left
Construction
Himachal Pradesh
9.12 Lacs
Due on : 02 Jan, 2024
C/O Retaining Wall Near Pond And Laying Of Under Ground Drainage Of Hume Pipes At Lower Bated Ward No. 9 G.P.Barotiwala Tehsil Badi Distt. Solan Hp.
#TBD : 30202838
0 Days Left
Construction
Himachal Pradesh
9.87 Lacs
Due on : 15 Dec, 2023
Construction Of Dumpers Places At Various Locations In Bbn Area Ten Nos. Dumpers Places.